Decmil - Pluto Site A Civil Works

23,000 cubic metres of concrete

Location Pluto LNG Project, Burrup Pennisula, WA
Principal Woodside
Killarnée's client Decmil
Construction period 2009-2010
Scope of works

The Woodside Pluto LNG Project comprises two 'greenfield' on-shore sites denoted as Site A and Site B. An existing haul road, running in an approximately north-south orientation, divides the two Sites: Site A is located adjacent the west side of this road and Site B is adjacent the east side.

Site B will contain the main process units and utilities associated with the LNG plant and Site A will contain storage tanks and associated utilities, import and export pipelines.

Construction activities

Construction activities include:

  • In-situ reinforced concrete bund walls to three perimeter sides of Condensate Tank area, including a central dividing wall within the bund area
  • Partial mass-concrete infill to trench beneath base of bund walls
  • Pipe culverts situated close to north-west and north-east corners of Condensate Tank bunded area
  • Pump pit adjacent west side Condensate bund
  • In-situ concrete flare tower foundation
  • Two Boil Off Gas (BOG) 'table top' in-situ concrete support structures including footing foundations
  • Concrete footings with pedestals for stick built steel frame enclosure to BOG compressors
  • Below ground cable installation, including pre-cast concrete lined cable trenches
  • Concrete pad foundations with pedestals for support to pre-assembled multi tier structural steel pipe racks and other pre-assembly structures
  • Concrete support for structural steel frame Analyser House
  • Concrete and asphaltic paving to selected areas including backfill to suit required levels. Graded material topping to remaining areas
  • Miscellaneous equipment footings