23,000 cubic metres of concrete
| Location |
Pluto LNG Project, Burrup Pennisula, WA |
| Principal |
Woodside |
| Killarnée's client |
Decmil |
| Construction period |
2009-2010 |
| Scope of works |
The Woodside Pluto LNG Project comprises two 'greenfield' on-shore sites denoted as Site A and Site B. An existing haul road, running in an approximately north-south orientation, divides the two Sites: Site A is located adjacent the west side of this road and Site B is adjacent the east side.
Site B will contain the main process units and utilities associated with the LNG plant and Site A will contain storage tanks and associated utilities, import and export pipelines. |
| Construction activities |
Construction activities include:
- In-situ reinforced concrete bund walls to three perimeter sides of Condensate Tank area, including a central dividing wall within the bund area
- Partial mass-concrete infill to trench beneath base of bund walls
- Pipe culverts situated close to north-west and north-east corners of Condensate Tank bunded area
- Pump pit adjacent west side Condensate bund
- In-situ concrete flare tower foundation
- Two Boil Off Gas (BOG) 'table top' in-situ concrete support structures including footing foundations
- Concrete footings with pedestals for stick built steel frame enclosure to BOG compressors
- Below ground cable installation, including pre-cast concrete lined cable trenches
- Concrete pad foundations with pedestals for support to pre-assembled multi tier structural steel pipe racks and other pre-assembly structures
- Concrete support for structural steel frame Analyser House
- Concrete and asphaltic paving to selected areas including backfill to suit required levels. Graded material topping to remaining areas
- Miscellaneous equipment footings
|