Cape Lambert Bridges

1,000 cubic metres of concrete

Location Cape Lambert, WA
Principal Rio Tinto
Killarnée's client MacMahon
Construction period 2011-2013
Scope of works

Concrete works for the Bridges over Rail at Boat Beach Road project within Cape Lambert. The project consists of the design and construction of 2 new Bridges over Rail. The Bridges are to replace the existing rail crossings on Boat Beach Road. The new bridges are:

  • Bridge 1 Dual Trough Beam, Dual Span, Total of 53m
  • Bridge 2 Triple Trough Beam, Dual Span, Total of 63m
Construction activities

Construction of the bridges includes:

  • Insitu concrete footings
  • Concrete slabs
  • Installation of tilt-panel precast concrete walls